Jump to content

Lake Michigan Wildcat: Details for Skinners


Recommended Posts

20 hours ago, Major Lee said:

20240413_165030.jpg

 

I am actually quite surprised that the rivets in that vertical line are that close together.  They should have had a similar spacing as those in the Horizontal row of rivets.

 

Wheels

  • Like 1

m4tsig-1.jpg.904ee58d95dd093266899d1cb845809a.jpg

Download Missions, Skins, & Essential files for IL-2 1946 and several other game series from Mission4Today.

Link to comment
Share on other sites

14 hours ago, wheelsup_cavu said:

 

I am actually quite surprised that the rivets in that vertical line are that close together.  They should have had a similar spacing as those in the Horizontal row of rivets.

 

Wheels

I am no spesialist , but would not that close riveting be weaknes ?

  • Like 2
Link to comment
Share on other sites

8 hours ago, Lusekofte said:

would not that close riveting be weaknes ?

Yes. The spacing should be a minimum of 3 times the diameter of the rivet being utilized for each hole.

Calculating Rivet Spacing

Calculating Rivet Spacing
https://youtu.be/Is5KcjW1o-Q

 

Wheels

  • Thanks 2

m4tsig-1.jpg.904ee58d95dd093266899d1cb845809a.jpg

Download Missions, Skins, & Essential files for IL-2 1946 and several other game series from Mission4Today.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...